Rapid Injection Moulds
Production-grade tooling engineered for speed, cost per part, and durability — built to run reliably with minimal downtime.
Typical response time: within 24 hours.

Tooling Capabilities

Gate & Runner Design
Hot/cold runner layouts to minimize shear and balance fill.

Cooling Optimization
Conformal cooling and baffle design for cycle-time reduction.

Material Expertise
ABS, PC, PA, POM, PP, high-temp and glass-filled resins.

Multi-Cavity & Family Tools
Balanced filling with rigorous tolerance control.

Surface & Tolerance
SPI finishes, EDM textures, tight tolerances to spec.

Maintenance & Spares
Standardized components and service kits for uptime.

Case Study — High-Cav Mould: 28% Cycle Time Reduction
Challenge: Long cycles and hotspots
Solution: Conformal cooling + gate redesign
Outcome: 28% faster cycles, 12% energy savings
Faster Cycles
Optimized cooling and ejection cut cycle times by 15–30%.
Lower Cost/Part
Tooling and resin strategies that reduce scrap and energy load.
Built to Last
Wear-resistant steels and inserts that extend tool life.
FAQs
What lead times can you hit?
Typical new tools: 4–10 weeks depending on complexity and cavity count.
Can you refurbish or optimize existing tools?
Yes—cooling, gating, and inserts are common upgrade paths.
What tolerances do you hold?
Tooling tolerances per drawing; production tolerances validated during trials.
Do you support PPAP/IATF documentation?
Yes—on request for automotive and other regulated sectors.
Ready to bring your product or process to life?
Let’s discuss your project today — from prototypes to production-scale automation.